Coating Terms

Search For Terms:
Term
Description
Dryness level needed to stack coated pieces is called dry to stack, and time needed to reach this dryness level is called dry to stack time. In order to measure dry to stack time, coated pieces are stacked so that coated surface touch each other and is subjected to a constant pressure (e.g, 50 kg/m²) applied by a mass for 24 hours. Later on, easiness of separation from each other is observed and coated surfaces are investigated for defects such as delamination etc.